A construction loan pays your builder in stages, so its features need to match your building contract. If the two do not line up, you can face delays, extra costs or a cash shortfall mid-build.
This guide is for Melbourne buyers who are about to sign a building contract or apply for finance. It covers the loan features that cause the most confusion, and the mistakes that come with them.
How Does a Construction Loan Draw Schedule Work?
A construction loan releases money in stages as the build reaches set milestones, rather than as one lump sum at settlement. Your lender pays the builder at each stage once the work is confirmed, and this is often called a progressive drawdown.
In Victoria, the Domestic Building Contracts Act 1995 sets out usual stages for payment. For a contract covering all stages, the usual schedule is 10 per cent at base, 15 per cent at frame, 35 per cent at lock-up and 25 per cent at fixing. Consumer Affairs Victoria says a different schedule needs legal advice, and that insurance may not cover work paid for before it is completed.
The common mistake is treating the lender's draw schedule and the builder's payment schedule as separate documents. Ask your broker to compare them before you sign, so each claim from your builder matches a stage your lender will fund.
Do You Pay Interest on the Full Loan Amount During the Build?
On most construction loans, interest is charged only on the amount drawn down so far, not on the full approved limit. Your repayments therefore start small and grow as each stage is paid.
This depends on the lender, as drawdown terms, repayment type during the build and fees are set by each lender rather than by law. Some lenders offer interest-only repayment options during construction, then move to principal and interest once the build finishes. The trade-off is that interest-only repayments do not reduce your debt, and the later principal and interest repayments are spread over a shorter remaining term, so they are higher.
As an illustration only, at an example rate of 6.75% p.a., a borrower who has drawn $200,000 so far would pay about $1,125 a month in interest only ($200,000 x 6.75% divided by 12). That figure rises with each draw. You can test your own numbers with our mortgage repayment calculator.
Ready to get started?
Book a chat with a Mortgage Broker at OVM Finance Group today.
Construction Loan Application: What Lenders Look at Before the Build
For a construction loan application, lenders assess your income, your debts and your building plans and contract, because they are lending against a home that does not yet exist. Lenders set the loan amount using their own valuation (often an 'as if complete' valuation) together with the land and building contract costs, and apply their own LVR limits. The lender's valuation and policy decide how much you can borrow.
APRA requires banks and other authorised deposit-taking institutions to test whether new borrowers can still meet repayments at a rate at least 3 percentage points above the loan rate. That test applies to construction loans too, so your borrowing capacity matters before you pick a block or a builder.
Expect to provide your building contract, plans and permits (such as a building permit), proof of the builder's registration and domestic building insurance. The exact documents vary by lender. Victorian guidance is that you should not pay a deposit until the builder provides a certificate of currency for the property.
Consider a Couple Building on Their Own Block
As an example, a couple in Melbourne's east owns a block and signs a fixed price building contract. Their draw schedule is set at five stages, but the builder's contract asks for a larger payment at frame than the lender's schedule allows.
The problem shows up before the contract is signed, when their broker compares the two schedules side by side. The couple asks the builder to adjust the staged payments so each claim lines up with a stage the lender will fund, and they get legal advice on the change, as Consumer Affairs Victoria recommends for any non-standard schedule.
The outcome is a build where no payment is held up waiting on a lender inspection. They also keep a small cash buffer for the variations that often arise mid-build. The trade-off is a little more time spent on paperwork before signing.
Fixed Price Building Contract or Cost Plus Contract?
A fixed price contract sets the total cost up front, while a cost plus contract charges the actual cost of the build plus the builder's margin. Lenders generally find fixed price contracts easier to assess, because the total loan amount is known from the start.
A cost plus contract can suit complex custom designs, but the final cost can rise, and your lender will still want a clear budget. The risk is that a higher final cost can leave you with a gap that the loan does not cover. If you are weighing up a custom home, speak to us early about how each structure suits your construction loans options.
Progress Inspections and Fees to Budget For
Lenders typically order a progress inspection before releasing each stage payment, and fees such as a progressive drawing fee may apply. Fees and inspection rules vary between lenders, so check them before you commit.
If you pay for your own separate inspections as well, Building Commission NSW gives $250 to $500 as an indicative cost for each one. That is a New South Wales figure, so treat it as a rough guide for Victoria. Extra inspections are optional but can catch problems before you pay for that stage.
Does the First Home Owner Grant Help When You Build?
Victoria's First Home Owner Grant is $10,000 for a new home valued up to $750,000. It is a single payment, and eligibility rules apply, so confirm them with the State Revenue Office before you rely on it.
If you are a first-time builder, our first home buyers page explains the other support that may be available. For investors, tax treatment of interest and holding costs during a build is complex, so speak with your accountant before making decisions.
Building Contract Rule Changes Coming to Victoria
The Domestic Building Contracts Amendment Act 2025 (Vic) has been deferred to commence on 31 March 2027. It lets deposit limits and progress payment stages be set by regulation, with payments for completed work subject to a proportionality requirement.
The Domestic Building Contracts Amendment Regulations 2026 have been made and are published, and they commence on 31 March 2027. Ask your builder and broker how the final deposit limits and progress payment rules apply to your contract.
Building a home involves many moving parts, and the right loan structure makes them easier to manage. Call one of our team or book an appointment at a time that works for you through our book appointment page, and we will walk through your contract and your loan together.
Frequently Asked Questions
How does a construction loan draw schedule work?
A construction loan releases funds in stages as the build reaches set milestones. Your lender pays the builder at each stage once the work is confirmed, so your payment schedule and the lender's schedule should match.
Do I pay interest on the whole construction loan during the build?
On most construction loans, interest is charged only on the amount drawn down so far. Terms vary by lender, so check the repayment type and fees before you commit.
What do lenders look at in a construction loan application?
Lenders assess your income, debts, building contract and plans. Banks regulated by APRA also test whether you could meet repayments at a rate at least 3 percentage points higher than the loan rate.
Is the First Home Owner Grant available when building in Victoria?
Victoria's First Home Owner Grant is $10,000 for a new home valued up to $750,000. Eligibility rules apply, so confirm them with the State Revenue Office.